Cake Factory Roof Rehabilitation Project

Project details

Scope of work :
  • Changing the damaged corrugated sheet with a new one, total area = 6830 m2 .
  • Changing the damaged corrugated sheet with Sandwich panel over the production hall area, total area = 3300 m2 .
  • Implement water proof insulation membrane sheet over the non damaged corrugated sheet ,total area = 14870 m2.
  • Changing the gutter drain .
  • Steel structure maintenance work .

owner

National Food Company (Americana – Cake division)

Location

Industrial Area # 01 – Jeddah

Project Area

25,000 m2

A working team of experts

Start your project with us

We are a leading company in providing value-added building and construction services to our clients by establishing a successful partnership with them throughout the construction process. We are committed to establishing constant relationships with our customers by exceeding their expectations and gaining their trust through exceptional performance by every member of the construction team.